Cable-stayed bridge over Korabelny Fairway

Cable-stayed bridge over Korabelny Fairway

Cable-stayed bridge over Korabelny Fairway

Cable-stayed bridge over Petrovsky Fairway

Cable-stayed bridge over Petrovsky Fairway

Double-deck bridge over Morskoy Canal

Tırnak

1

The (WHSD) Western outer highway project's arduous 11,57 kilometer section consists of the construction of a viaduct that has 2081 meters on ground and the other 5297 meters above sea, the construction of 620 meter and 580 metre suspension bridges, a 168 meter sea-canal bridge, 2417 meters of technological filling and a 407 meter tunnel.

Tırnak

2

Most of the highway will be constructed by a group consisting mostly of Turkish and Italian engineers.

Tırnak

3

During the process of both design and construction an approximate 5 thousand people will be employed.

Tırnak

4

Using the "Launching" (the process of using a sledge for construction) method, the road which will be constructed will take place among the worlds most technological transportation projects.

Tırnak

5

The project will take place under the circumstances using over sea constructions , temporary bridges and technological platforms.

kapat Project

St. Petersburg is a key motorway hub located at the intersection of transportation routes linking the Scandinavian Peninsula, continental Europe, Central Russia, and the Baltic States.

 

Western High-Speed Diameter (WHSD) is a unique high-speed urban motorway being built in St. Petersburg.

- WHSD is an investment project of an international scale implemented in St. Petersburg. Construction of WHSD is the largest PPP project in the field of road construction in the world.

- WHSD is a motorway tackling St. Petersburg transport issues, allowing to bring down traffic intensity in the city centre and solve congestion problems at the Vasilievsky Island and in the northern and southern districts of the city.

- WHSD is the first urban high-speed toll motorway in Russia.

- WHSD is the project defining St. Petersburg’s development as a large world-class transportation hub.  

- WHSD boasts unique engineering structures and has an instantly recognisable visual image of a motorway becoming a new St. Petersburg landmark.

 

The Project comprises the following five main Phases

Phase 1 and 2: Southern Section (mostly through dense urban facilities of the city of St. Petersburg);

Phase 3: Northern Section (through agricultural and open land);

Phase 4 and 5: Central Section (through Neva Bay and along the Vasilievsky Island).

 

kapat Project

 

Consortium "Northern Capital Highway" (NCH) won he tender for right to construct the central section and to operate the whole route of the Western High-Speed Diameter (WHSD). The consortium is comprised of

• VTB CAPITAL,

• Gazprombank 

International construction companies

• ASTALDI (Italy)

• IC İÇTAŞ İNŞAAT (Turkey) 

 

Design works of WHSD Project have been subcontracted to one of the major engineering group JSC “Institute Strojproect” which has developed more than 600 of transport structures in different regions of Russia.IC İÇTAŞ İNŞAAT (Turkey) ASTALDI (Italy).

 

The (WHSD) Western outer highway project's arduous 11,57 kilometer section consists of the construction of a viaduct that has 2081 meters on ground and the other 5297 meters above sea, the construction of 620 meter and 580 metre suspension bridges, a 168 meter sea-canal bridge, 2417 meters of technological filling and a 407 meter tunnel.

 

Most of the highway will be constructed by a group consisting mostly of Turkish and Italian engineers.

 

During the process of both design and construction an approximate 5 thousand people will be employed.

 

Using the "Launching" (the process of using a sledge for construction) method, the road which will be constructed will take place among the worlds most technological transportation projects.

 

The project will take place under the circumstances using over sea constructions , temporary bridges and technological platforms.

kapat Project

Established in the partnership of IC İçtaş Construction, which is the locomotive company of IC İbrahim Çeçen Investment Holding A.S. and put its signature under important successes on international platform, and internationally successful construction company Astaldi, ICA is building the Yavuz Sultan Selim Bridge and the Northern Marmara Motorway Project, one of the most important projects of Turkey, along with project for broadening the Pulkovo Airport in St. Petersburg and the Western Beltway (WHSD) project in St. Petersburg again   
 

 

kapat Project
Locomotive company of IC İbrahim Çeçen Investment Holding A.S., IC İçtaş Construction is a global brand preferred in local and foreign macro scaled and featured projects for its experience and knowledge of more than 40 years. It is placed near the top in the sector sorting in Turkey and the world. 
 
IC Içtaş Construction has put its signature under many successful projects such as constructions of airports, ports, marinas, high speed train projects, road and bridges, high capacity powerplants, smart buildings, business centres, tourism facilities, irrigation system constructions, public buildings, community buildings, health facilities, universities and schools since the day it was established until today.  
 
It successfully continues its business in airport, seaport, and marina operating along with construction projects. It has been a business partner preferred and trusted by the leading companies of the world for its knowledge, experience, project delivery on time, and commitment to comply with international standards and it took the 
 
213th place in 2010
 
209th place in 2011 in ENR (Engineering News Record) list of the biggest international constructors  
 
 
 
 
IC İçtaş Construction is an effective player in energy sector as well in production and distribution with the investments it has made.  
 

 

kapat Project
 
One of the most successful construction companies of Italy and the world, Astaldi stands out in transportation, energy, civil and industrial construction and infrastructure. Having been traded at the Milano Stock Exchange since 2002, the company has been continuously growing and developing with a staff of experienced managers and more than 9.900 employees.  
 
Astaldi continues its operations in 25 countries worldwide including Turkey. Especially strong in Venezuela, Turkey, Poland, Romania, Italy, Chile, and Algeria markets, the company operates in construction works of roads, railroads, subways and power plants in this country. Having important businesses in America and Russia about transportation infrastructure, Astaldi operates in Peru and Central America in transportation and hydroelectric sector. 
 
 

 

kapat Project

 
Click to download
Corporate Logo of ICA as vectoral.
 

 

kapat Project
eng47
Download pdf 07.10.2014

eng46
Download pdf 19.09.2014

eng45
Download pdf 10.09.2014

eng44
Download pdf 17.06.2014

eng43
Download pdf 11.04.2014

eng42
Download pdf 11.04.2014

eng41
Download pdf 03.04.2014

eng40
Download pdf 02.04.2014

eng39
Download pdf 03.03.2014

eng38
Download pdf 06.02.2014

eng37
Download pdf 04.02.2014

eng36
Download pdf 24.01.2014

eng35
Download pdf 22.01.2014

eng34
Download pdf 16.01.2014

eng33
Download pdf 23.12.2013

eng32
Download pdf 23.12.2013

eng31
Download pdf 12.12.2013

eng30
Download pdf 25.11.2013

eng29
Download pdf 19.11.2013

eng28
Download pdf 09.11.2013

eng27
Download pdf 02.11.2013

eng26
Download pdf 02.11.2013

eng25
Download pdf 30.09.2013

eng24
Download pdf 25.09.2013

eng23
Download pdf 24.09.2013

eng22
Download pdf 23.09.2013

eng21
Download pdf 17.09.2013

eng20
Download pdf 04.09.2013

eng19
Download pdf 25.07.2013

eng18
Download pdf 15.07.2013

eng17
Download pdf 12.07.2013

eng16
Download pdf 04.07.2013

eng15
Download pdf 03.07.2013

The construction process of the WHSD Central Section started at full speed
Download pdf 28.06.2013

WHSD is constructing the cable-stayed bridge
Download pdf 21.06.2013

One more cable-stayed bridge will be constructed in St.Petersburg
Download pdf 21.06.2013

What will save Vasilyevsky Island from traffic jams
Download pdf 20.06.2013

Construction of Bridge across the Neva is scheduled to start in July
Download pdf 17.06.2013

At Kanonerskiy Island the construction process of the WHSD Central Section started at full speed
Download pdf 10.06.2013

The Contractor for construction of WHSD Central Section starts erection of the unique bridge across Bosphorus
Download pdf 24.05.2013

How WHSD will be constructed
Download pdf 24.05.2013

The Central Section of WHSD will have been constructed by 2016
Download pdf 22.05.2013

The Central Section of WHSD has been acknowledged as the best urban development project in Europe in 2012
Download pdf 30.04.2013

Construction of WHSD has started on Vasilyevsky Island
Download pdf 21.03.2013

Documentation will be developed for the Central Section of the WHSD
Download pdf 03.03.2013

The construction permit was obtained for the Central Section of WHSD Project
Download pdf 07.02.2013

WHSD will sign new Agreement on PPP
Download pdf 20.12.2012

kapat Project
kapat Project
hover
This is a pretty long title

Mart 2016

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 9 (Date: SEPTEMBER 2015)

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 8 (Date: JUNE 2015)

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 7 (Date: MARCH 2015)

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 6 (Date: JANUARY 2015)

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 5 (Date: NOVEMBER 2014)

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 4 (Date: AUGUST 2014)

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 3 (Date: JUNE 2014)

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 2 (Date: APRIL 2014)

hover
This is a pretty long title

About a project of construction of the WHSD Central Section. Part 1 (Date: OCTOBER 2013)

hover
This is a pretty long title

Introduction Film

kapat Project
kapat Project
kapat Project